Demurrage Calculator & Laytime Planner for Tanker Cargoes

The Marine Terminal Demurrage & Berth Risk Planner helps fuel exporters, charterers and terminal teams forecast demurrage before the ship arrives, calculate laytime from the statement of facts after it sails, and recover what the contracts allow.

14Delay risk drivers with P90 exposure
60Statement-of-facts periods per laytime calculation
12Claim documents tracked against time bars
USD 1,250Cost of one hour at USD 30,000/day (example)
Video walkthrough

What you get

  • Excel planner: Call Plan, Risk Drivers, Mitigation, SOF Laytime Calc, Pumping Performance, Contract Chain, Claim & Time Bar and Lists tabs
  • Detailed PDF guide: BIMCO laytime definitions, Asbatankvoy and Shellvoy clauses, notice of readiness and a six-phase control checklist
  • Worked example: from plan to claim, with fictitious figures you can replace
  • Instant download: after checkout, kept in your account

What Is Demurrage in Shipping?

Demurrage is the compensation a charterer pays the shipowner when a vessel is kept at the load or discharge port longer than the laytime agreed in the charter party. On a clean tanker it is a fixed daily rate, paid pro rata by the hour, so small delays add up fast.

Vessel demurrage is different from container demurrage and detention. In tanker trading it sits between three contracts: the charter party, your purchase contract and your sales contract. If they do not match, you pay the owner and cannot pass the cost on.

How to Calculate Laytime and Demurrage

Laytime usually starts when a valid notice of readiness (NOR) is tendered, plus the notice time in the charter party (often six hours), or when the vessel is all fast if earlier. It ends when the hoses are disconnected. Shifting, vessel faults and agreed exceptions are deducted.

Demurrage = (laytime used − laytime allowed) ÷ 24 × daily demurrage rate
Worked example (fictitious)Value
Vessel and rateMR tanker, USD 30,000 per day
Laytime allowed48 hours
Planned probability of demurrage74%, P90 exposure USD 17,047, MEDIUM
Actual time on demurrage (SOF)24.3 hours = USD 30,375
Not recoverable from the buyerUSD 9,025
First deadlineBuyer notice in 30 days, before the owner's claim deadline

Where Demurrage Money Leaks

  1. Unplanned waiting because the berth, shore tanks or inspector were not ready.
  2. Laytime counted wrongly: notice time, shifting or half-rate events missed.
  3. Weak statements of facts that cannot prove a claim.
  4. Claims lost to time bars.
  5. Costs you cannot pass on because the contracts do not match.

Inside the Planner

TabWhat it does
Call PlanExpected timeline, laytime used and remaining, exposure and cost of delay
Risk Drivers14 delay causes with min, likely and max hours; probability, P90, worst case and rating
MitigationActions ranked by net saving
SOF Laytime CalcUp to 60 periods; the exact minute laytime ran out and demurrage owed
Pumping Performance24-hour or 100 psi warranty tested against the pressure log
Contract ChainWhat you can recover from buyer and seller
Claim & Time BarDeadlines and a 12-document checklist
ListsCounting rules, preset to typical Asbatankvoy terms

Laycan vs Laytime, and How to Reduce Demurrage

Laycan is the window in which the vessel must arrive and tender NOR; laytime is the time allowed to load or discharge once it is there.

  • Book the berth window and confirm shore tank space early
  • Pre-appoint the inspector
  • Check the pumping warranty and keep an hourly pressure log
  • Record every delay in a signed statement of facts
  • Align laytime and rates across the charter party and both sales contracts

Who It Is For

Fuel exporters, charterers, traders and terminal coordinators handling EN590 diesel, jet fuel, gasoline or fuel oil cargoes.

Save With a Bundle

Fuel Trading Operations Bundle

$497

6 tools for freight, Worldscale, demurrage, pipelines and rack margins (value $894).

See what is included →

Master Fuel Trading Toolkit

$1,497

26 fuel trading tools, including the Operations Command Center (value $3,424).

See what is included →

Hyvnd All-Access

$1,997

Every Hyvnd fuel and SAF tool, all 45 tools (value $5,956).

See what is included →
Best value · Offer period

Institutional Fuel Deal Execution – Private Mentorship

Move from scattered industry information to a disciplined institutional execution path, with better clarity, documentation flow and mandate positioning.

  • Full institutional fuel deal curriculum: from mandate positioning to deal progression and closing structure
  • ICPO, LOI, FCO and SPA templates and checklists for deal readiness
  • Guided review of your live deal pipeline: what is credible, what is weak and what needs restructuring
  • Mandate positioning, refinery and trader communication, plus deal triage to filter fake offers
  • All 3 programs: Foundations Fuel Trade ($497), Global Fuel Trade Vault ($1,497) and the Private Mentorship ($7,500)
  • Every Hyvnd tool (refinery, SAF and beginner) with step-by-step walkthrough videos
  • 1 year of fuel deal execution support and private access to updates
Total value over $50,000$7,500Offer period price · all 3 programs + every toolJoin the Private Mentorship →

Demurrage & Laytime: Frequently Asked Questions

What is demurrage in shipping?

The money a charterer pays the shipowner when a vessel stays at port longer than the agreed laytime, usually a daily rate paid pro rata.

How is laytime calculated?

From valid NOR plus notice time (or all fast, if earlier) until hoses off, minus excluded periods. Demurrage = (laytime used − allowed) ÷ 24 × daily rate.

What is the difference between laycan and laytime?

Laycan is the arrival window; laytime is the time allowed to load or discharge.

How can I reduce demurrage costs?

Plan the berth window, confirm shore tanks and inspector early, check the pumping warranty, keep a signed SOF and align all three contracts.

Which charter parties does it support?

It is preset to typical Asbatankvoy rules and covers Shellvoy-style wording; you set the counting rules per charter party.

Is this legal advice?

No. Contract wording decides how laytime and demurrage are counted. Example figures are fictitious.

Plan it, prove it, claim it

One avoidable demurrage day can cost more than this planner many times over.

Educational and operational tool. Not legal advice. Contract wording decides how laytime and demurrage are counted. Example figures are fictitious.